- From [[mass production]] to [Flexible production
- Mass production economies of scale are less likely to work
- Toyota Production System : pull system to make necessary quantities as needed
- Introduced to the world in 1991 with [The Machine That Changed the World
- constraint theory : make only the quantity needed by the bottleneck at the bottleneck’s direction
- 1984 The Goal.
- Delayed Evaluation calculates the value when it is needed.
- This is a pull system
- 2008 Delayed Evaluation Study.
- How to study when you need it.
- Conventional education was a method of creating economies of scale through mass production by “creating multiple people with the same content knowledge at the same time.
- The appropriate educational strategy will differ depending on whether you want to produce a large number of people with the same content or a diverse workforce.
This page is auto-translated from /nishio/遅延評価はプルシステム using DeepL. If you looks something interesting but the auto-translated English is not good enough to understand it, feel free to let me know at @nishio_en. I’m very happy to spread my thought to non-Japanese readers.