from Diary 2022-11-23 Cost of getting in and out and keeping out What I thought when I saw the story about the messy desk. image

  • Changing from state 1 to state 2 seems less costly.
  • But in reality, the cost is increasing in the area represented by the red line in 3.
    • Cost of leaving it out
      • By having things on the desk.
        • When you want to put something down, you have to move it out of the way first.
        • Piles of stuff collapsed or
        • It’s buried and you don’t know where it is, and it takes more time to access it when you need it.
  • In some situations, changing from 3 to 1 may lower the cost.

Related:. - Significant costs incurred due to delays


This page is auto-translated from /nishio/出し入れのコストと出しっぱなしのコスト using DeepL. If you looks something interesting but the auto-translated English is not good enough to understand it, feel free to let me know at @nishio_en. I’m very happy to spread my thought to non-Japanese readers.